Which of the following soils can support the least load-bearing pressure?

❎ Sedimentary rock

❎ Poorly graded gravel

⭕️ Silt with high compressibility

❎ Poorly graded sands

♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡

In general, the grading around a building should be positively sloped for how many feet away from the building?

❎ 25 feet

❎ 50 feet

❎ 5 feet

⭕️ 10 feet

♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡

Flashing is not required at which of the following locations?

❎ At wall and roof intersections

❎ At built-in gutters

⭕️ Above projecting masonry

❎ Above projecting wood trim

♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡

Under which of the following conditions is a two-coat stucco system acceptable on the exterior of a building?

⭕️ If the system is installed over masonry or concrete

❎ If the first coat is allowed to cure for a minimum of three days before the second coat is applied

❎ If the sand-to-cement volume ratio is higher than three for the finish coat

❎ If the system is installed in an arid climate

♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡

Which of the following locations is the worst place to cut a hole in an I-joist?

❎ I-joists must never have holes cut in them

❎ Near the end of the joist in the web

❎ In the center of the web

⭕️ In the flange

♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡

Why must building footings extend below the frost line?

❎ Because the footing could crack when the soil around it freezes and expands if it is not below the frost line

❎ Building footings are not required to extend below the frost line unless the building is located in a very cold climate

⭕️ So that the soil around the footing does not freeze, expand, and cause the footing to shift

❎ So that the water in the concrete will not freeze and cause spalling in the footing

♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡

Which of the following locations does not require a GFCI outlet?

❎ Receptacles on kitchen counters

❎ Receptacles in bathrooms

⭕️ Receptacles that serve appliances

❎ Receptacles near utility sinks

♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡

Which of the following is the way that most homes’ electrical systems are grounded?

⭕️ Through a connection to the water piping

❎ Through a connection to the foundation

❎ Through a connection to an antenna

❎ Through a connection to electrical service panel

♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡゚・。♥。・゚♡